a NOT-FOR-PROFIT company |



|
ClO2 - Summary |
|
Procedures for Engagement |
|
|
|
|
|
|
|
N.B. Because ETI Biotech is a “NOT-FOR-PROFIT” company, all the following will be required to be fully funded in advance. |
|
|
|
A team from ETI Biotech will be sent to site to perform a full scientific and engineering assessment on which any proposal will be based. The team will typically consist of up to 5 members of the ETI Biotech Team. The time required for the assessment will vary according to the specific client circumstances but should take approximately 10 days. All costs for transport, accommodation and meals and a per diem to cover time and personal incidentals for each team member will be covered by the client, or by the sponsoring agency. |
|
Stage Two: Planning |
|
On completion of the assessment trip the ETI Biotech team will compile a plan of action which will include the specific technical requirements for the job/s in hand. This will be presented to the client and/or sponsoring agency. |
|
Stage Three: Implementation |
|
The ordering of materials as required and the construction of new or adaptation repair of existing water treatment facilities will be instituted under the full supervision of our regional consultant. At this stage potential staff for the site will be screened and appointed ready for the final stage. |
|
Stage Four: Training and Commissioning |
|
When the plant has been completed including tanks, pumps piping, dosing equipment etc., it will be commissioned by our appointed engineer and the permanent site staff will receive full hands on training. Should it be necessary, site staff will have direct access to The ETI Biotech head office engineering team for any ongoing issues such as expansion of the facility or future upgrades thereof. |
|
|
|
|